Applications · By industry
Meteorology. Every launch, on time.
Upper-air stations inflate radiosonde balloons on a fixed schedule, twice a day, every day. Hydrogen made at the station removes the dependence on a cylinder delivery.
HYDROWhat this industry needs
National weather services launch radiosonde balloons on a fixed daily schedule from hundreds of stations.
Hydrogen is the standard inflation gas — lighter than helium, without helium's supply risk — and a missed launch window cannot be made up.
How it works
From the sample or the process to the result, and the gas used at each step.
The radiosonde is checked and the balloon is prepared for the scheduled launch.
The balloon is filled with hydrogen to the lift the sounding needs.
The balloon rises through the atmosphere, transmitting pressure, temperature, humidity and wind.
The sounding feeds the global weather models within the hour.
Where Leman fits
The Leman product lines this industry uses, and what each one does.
In depth
Hydrogen for balloons
Hydrogen is the lightest gas and has long been used for sounding balloons; it gives more lift than helium and is made from water and electricity. A HYDRO generator fills a storage buffer between launches, so the station has hydrogen ready for every scheduled sounding.
Remote stations
Many upper-air stations are on islands, mountains or in polar regions, where every cylinder delivery is a logistic operation. Making hydrogen on site removes that dependency.
On the bench
Application by application: the equipment you will find, the gas it needs and the Leman generator that makes it.
| Application | Equipment | Gas it needs | Leman generator |
|---|---|---|---|
| Radiosonde balloon inflation | Upper-air ground stations | H₂ fill gas, twice a day | HYDRO50 LHYDRO65 L |
| Remote and island stations | Upper-air stations without a delivery route | On-demand H₂ | HYDRO50 L |
Questions we hear
Straight answers to what labs ask us first.
We've always used cylinders and it works.
Until a delivery is late: the launch window is set by the schedule, not by the truck. A generator removes that single point of failure.
Other industries
Your methods and procedures set the gas specifications; a Leman engineer confirms flows, pressures and purities before quotation.